Civil Engineering
2025-09-26
0
With a reuse rate of 250-300 times, far exceeding ordinary steel formwork (50-80 times) and wooden formwork (3-5 times), it is 3-4 times that of ordinary steel formwork.
The cost per use is only 1/12 to 1/6 of that of wooden formwork, and 20%-30% lower than aluminum alloy formwork, demonstrating a significant cost advantage in long-term, large-scale projects.
After disposal, the alloy material can be 100% recycled and reused, with a residual value rate as high as 35%-40%, 10%-15% higher than that of aluminum alloy formwork.
English
中文
日本語
한국어
français
Deutsch
Español
русский
português
العربية
tiếng việt
ไทย
Polska
Home